flowition
flowition = flow (as in workflow) + -ition (as in notation): a notation for agent workflows.
Deterministic multi-CLI agent workflow engine. Write a plain-JS file that orchestrates real coding-agent CLIs — claude, codex, amp, droid, opencode, pi, cursor, grok — with programmatic control flow, then run it, watch it, steer it mid-run, and resume it after an interruption.

// review.workflow.js
export const meta = { name: 'review', description: 'cross-provider review' }
export default async function ({ agent, parallel, phase }) {
phase('Review')
const [a, b] = await parallel([
() => agent('Review src/ for bugs. Return the top 3.', { adapter: 'claude', model: 'claude-sonnet-5' }),
() => agent('Review src/ for bugs. Return the top 3.', { adapter: 'codex', model: 'gpt-5.2' }),
])
phase('Judge')
return agent(`Merge these two reviews, consensus first:\nA: ${a}\nB: ${b}`, { adapter: 'codex' })
}
flowition run review.workflow.js
The CLI installs as flowition, with flo as a short alias.
Each agent() call spawns a real CLI process with full permissions in your
working directory. Read the Security section before running
anything you did not write.
Why flowition
- Eight CLI families, one DSL. Every
agent()call picks its adapter; schemas, steering, resume, transcripts, and budgets behave uniformly across all of them. - Mid-run communication is first-class. Steer a running agent from another
terminal (
flowition send), from workflow code (spawn()handles,sendTo()); the workflow can block on operator input (ask()/flowition answer), and agents report upward withflowition post. - Resume continues provider sessions. Completed agents replay instantly from the journal (chained deterministic keys); interrupted agents continue their provider session where they left off — session ids are journaled per agent.
- Per-agent control, detached supervision. Cancel one agent without killing
the run; run detached and inspect from any other terminal or agent with
status/tail -fover a per-run control socket. - Both directions. Flowition invokes agent CLIs, and agent CLIs invoke flowition —
via the plain CLI (
--json,--detach) or the built-in MCP server (flowition mcp).
Requirements
- Node >= 18.17. Flowition itself has zero runtime dependencies.
- Each adapter you actually use needs its CLI installed and authenticated:
claude (Claude Code),
codex (OpenAI Codex CLI),
amp,
droid (Factory),
opencode,
cursor-agent (Cursor),
grok (Grok Build CLI),
and pi.
You only need the ones your workflows reference;
flowition doctorreports which are found and what each supports.
Installation
npm i -g flowition
flowition doctor # verify which adapter CLIs are installed
Contributors can install from a clone instead:
git clone https://github.com/ben-vargas/flowition.git
cd flowition
npm link # exposes `flowition` (and `flo`) on PATH
npm test # root node:test suite; mock adapter, no API credits consumed
Quick start
Save as hello.workflow.js:
export const meta = { name: 'hello', description: 'one tiny agent' }
export default async function ({ agent }) {
return agent('Reply with exactly the single word: pong')
}
flowition run hello.workflow.js # foreground, live narration
flowition run hello.workflow.js --adapter codex # same workflow, different CLI
flowition run hello.workflow.js --detach # background → prints a runId
flowition status <runId> # phases, per-agent state, open questions, spend
flowition tail <runId> -f # follow the run narrative
flowition tail <runId> --agent 0 # follow one agent's transcript
flowition send <runId> 0 "shorter" # steer a running agent by index or label
flowition answer <runId> q0 "ship it" # answer a workflow ask()
flowition cancel <runId> --agent 0 # cancel one agent (omit --agent for the run)
flowition resume <runId> # replay finished agents; continue interrupted ones
Viewer
flowition viewer starts the v1 browser UI for the runs under
$FLOWITION_HOME/runs (default ~/.flowition/runs). It binds loopback only and
prints an authenticated URL. The Agents tab groups the run by phase; selecting
a row opens that agent's transcript:

flowition viewer # read-only; Ctrl-C stops it
flowition viewer --open # also open the URL on macOS/Linux
flowition viewer --port 0 # choose an ephemeral port
flowition viewer --control # opt in to all five mutations
flowition viewer --control=send,answer # or grant only a subset
The default is deliberately read-only: send, answer, cancel, resume, and delete
routes return 403 until their capability is enabled with --control. Starting
with --control mints a control token that exists only in that server process.
It cannot be added to an already-running viewer; stop that process and restart
it with --control, or use an explicit second --port.
For a foreground, non-JSON, non-quiet run in a TTY, flowition run discovers or
auto-starts a viewer and prints a verified deep link to the run. Detached, MCP,
--json, and --quiet runs never auto-start it. Disable this behavior with
--no-viewer or FLOWITION_NO_VIEWER=1. Auto-started viewers are read-only and
use idle shutdown (15 minutes by default); an explicit server can opt into the
same policy with --idle-shutdown --idle-timeout <minutes>.
The printed URL carries the read token, and for a fresh --control process the
control token, in the URL fragment. The browser moves them into
sessionStorage and removes them from the address bar before routing.
flowition viewer --print-url prints a fresh read-only URL for a live instance;
it cannot recover the in-memory control token. Treat a viewer URL as sensitive:
the read token exposes prompts, transcripts, args, and results for this
Flowition home, while the control token can steer full-permission agents and
change run lifecycle state.
Tailnet access (Tailscale Serve)
The viewer never listens on a non-loopback address, but it can be reached from your own tailnet through Tailscale Serve, which terminates tailnet TLS and proxies to the loopback port:
flowition viewer --port 4646 --tailscale-origin https://machine.tailnet-name.ts.net
tailscale serve --bg 4646
--tailscale-origin requires an explicit fixed --port and accepts exactly one
canonical HTTPS *.ts.net origin. Serve's external HTTPS port defaults to 443;
an origin with a nonstandard port (https://machine.tailnet-name.ts.net:8443)
needs the matching flag: tailscale serve --bg --https=8443 4646.
The flag teaches the request gates about that one
path: the .ts.net name joins the closed Host allowlist, requests for it must
carry Serve's X-Forwarded-Proto: https, and anything marked as public Funnel
traffic (Tailscale-Funnel-Request) is refused — use tailscale serve, never
tailscale funnel. Every other gate is unchanged: tailnet requests need the
same bearer token, and mutations still need --control plus the control token.
The startup banner prints both the local and the tailnet URL; open the tailnet
one from another machine on your tailnet. All tokens travel in the URL fragment,
which never crosses the network.
The viewer reads the same append-only artifacts used by the CLI and degrades unknown or older fields instead of requiring a migration. The exact module, security, packaging, and on-disk contracts are documented in ARCHITECTURE.md.
Core concepts
The workflow contract
A workflow is a plain ES module — no source transform, no vm. It exports meta
(name, description, optional phases, optional argsSchema) and a default
async function that receives the toolkit:
export default async function ({ agent, spawn, step, parallel, pipeline, phase,
log, ask, sendTo, args, budget, now, random }) { … }
agent(prompt, opts) resolves to the agent's final text, or a validated object
when opts.schema is set. Options include adapter, model, effort,
system, schema, cwd, label, and key. spawn() is agent() returning
immediately with a steerable handle ({ done, send }). parallel(thunks) is a
barrier; pipeline(items, ...stages) runs each item through stages with no
barrier between them — prefer it. flowition guide prints the full authoring
contract, written to be pasted into an agent's context.
Input contracts
meta.argsSchema declares what the run's --args value must look like, using
the same JSON Schema subset as agent output schemas (unsupported keywords are
rejected loudly, never silently ignored):
export const meta = {
name: 'release',
description: 'cut and publish a release',
argsSchema: {
type: 'object',
properties: { version: { type: 'string', minLength: 1 }, dryRun: { type: 'boolean' } },
required: ['version'],
additionalProperties: false,
},
}
The effective args are validated before any agent or step executes — on fresh
runs and resumes alike — and a violation fails the run with the schema paths
that did not match. No defaults are merged: the toolkit's args is still the
--args value verbatim.
Durable steps
step(name, args, fn) runs local code — git commands, file writes, API calls —
as a journaled unit of work. When the callback completes, its JSON result is
written to the journal, and a resume replays the recorded result instead of
re-executing the callback (incomplete or failed attempts re-run):
const branch = await step('create-branch', { name: `release/${args.version}` }, async () => {
execSync(`git switch -c release/${args.version}`)
return { branch: `release/${args.version}` }
})
name plus the canonicalized args are part of the step's resume identity —
changed args are a different step and never reuse a cached result. Steps keep
their own per-branch counter, independent of agents, so inserting or removing a
step never shifts agent resume keys. Args and results must be plain JSON
(undefined, functions, NaN, BigInt, and cycles are rejected loudly); a
void callback resolves to null. Steps appear in flowition status, tail,
the web viewer's run snapshot,
and the MCP snapshot alongside agents.
The guarantee is durable memoization, not exactly-once side effects: an
append-only journal cannot commit an external effect and its completion record
atomically. A completed step never re-runs; a step interrupted between its
effect and its completion record — and a failed step — re-runs on resume.
Write callbacks to be idempotent, or carry an idempotency key in args.
Editor autocomplete
The npm package ships declarations for the workflow toolkit, but editors do not
search globally installed packages. Install flowition locally in the project
where you author workflows, even if the CLI you run remains the global one:
npm install --save-dev flowition
Note that workflow files are ES modules, and Node decides how to parse a .js
file from the nearest package.json. If the install above creates one (npm init -y writes "type": "commonjs"), make sure it carries "type": "module" — or
name your workflows .mjs — or the workflow will fail to load.
Then use a JSDoc type annotation in the plain-JavaScript workflow:
// @ts-check
/** @type {import('flowition').WorkflowMeta} */
export const meta = { name: 'review', description: 'review one target' }
/** @satisfies {import('flowition').JSONSchema} */
const FINDINGS = {
type: 'object',
properties: { items: { type: 'array', items: { type: 'string' } } },
required: ['items'],
additionalProperties: false,
}
/** @type {import('flowition').Workflow<{ target: string }>} */
const workflow = async ({ agent, args, phase }) => {
phase('Review')
return agent(`Review ${args.target} for bugs`, { schema: FINDINGS })
}
export default workflow
The @satisfies tag on a hoisted schema is not optional under @ts-check:
without it type: 'object' widens to string and no longer matches the schema
type. A schema written inline in the agent() call is contextually typed and
needs no annotation.
The JSDoc import is erased tooling syntax: it does not import or execute
flowition at runtime — the package exposes types only, and a runtime
import('flowition') fails with ERR_PACKAGE_PATH_NOT_EXPORTED by design. A
global npm i -g flowition alone cannot provide this editor resolution.
Adapters
| adapter | steering | resume vehicle | schema mode |
|---|---|---|---|
| claude | live | claude -p --resume <sid> |
native |
| amp | live | amp threads continue <id> |
prompt |
| codex | turn | codex exec resume <tid> |
native |
| droid | turn | droid exec -s <sid> |
prompt |
| opencode | turn | opencode run --session <id> |
prompt |
| pi | turn | pi --session-id <uuid> |
prompt |
| cursor | turn | cursor-agent -p --resume <sid> |
prompt |
| grok | turn | grok --resume <sid> |
native |
Live steering injects your message into the running process's stdin. Turn
steering queues it and delivers it as a session-resume follow-up turn when the
current turn ends; either way, agent() resolves only after every accepted
message has been consumed, so steering is always reflected in the result.
One cursor quirk: cursor encodes reasoning effort into the model id itself
(gpt-5.6-sol-xhigh, claude-opus-4-8[effort=high]) — there is no effort
flag, so effort on a cursor agent is rejected at agent() time;
cursor-agent --list-models lists the ids.
One grok quirk: grok 1.0.3 --reasoning-effort accepts only
low|medium|high|xhigh. flowition maps none/minimal → low and
max → xhigh; omitted effort passes --reasoning-effort high.
One amp quirk: amp selects agent modes (bundled model + prompt + tools), not
models. On amp, model/mode resolves against the builtin modes
(low/medium/high/ultra) and any custom modes installed as amp plugins, by key
or label; flowition doctor lists what's discovered.
Structured output
schema uses the CLI's native mechanism where one exists (claude and grok
--json-schema, codex --output-schema) and an appended output-contract block
plus loose JSON parsing elsewhere. All modes re-validate client-side; a failure
triggers one corrective follow-up turn in the same session before the agent
fails with schema_invalid. The built-in validator implements a documented
subset of JSON Schema (type, required, properties, additionalProperties,
items, enum, const, min/max bounds, anyOf); unsupported keywords such
as pattern or oneOf are rejected loudly, never silently ignored. Caveat for
codex: OpenAI's strict mode requires every property to be listed in required —
express optional fields as nullable, e.g. { "type": ["string", "null"] }.
Determinism and resume
Use the injected now() / random() instead of Date.now() / Math.random()
— they are journal-seeded with per-branch substreams. Pass thunks to
parallel(). Every agent() call gets a chained positional resume key derived
from its branch, index, prompt, and resolved spec, so replay is stable
regardless of completion order.
flowition resume <runId> (or flowition run <file> --resume <runId>) replays completed
agents and completed step() results from the journal and re-runs the rest; an
interrupted agent whose
provider session id was journaled continues that session with an
"interrupted, finish the task" nudge rather than starting over. Undelivered
steering mail is restored, ask() answers replay, and the budget ceiling is
restored. Resume refuses — loudly, rather than silently forking history — when
the workflow file or any local import changed (byte-for-byte hash of the module
graph), when args differ, or when the workflow contains constructs the import
scanner cannot follow statically (eval, Function(, computed dynamic
imports). Fresh runs are never affected by those constructs.
Cross-run result seeding
When resume refuses because you edited the workflow, the completed results of the
old run don't have to be paid for again: flowition run new.workflow.js --seed-from <runId> loads a settled source run's journal read-only and reuses its completed
agent results as a candidate cache. Derived resume keys hash branch position +
prompt + resolved spec — no run id, no file hash — so an unchanged agent() call
matches across runs and replays instantly, while the calls you edited derive new
keys and run fresh. Each hit is durably written into the new run's journal with
seeded provenance (source run id and usage), so the target resumes normally even
after the source run is deleted, and seeded results add zero to the new run's
budget/spend.
This is operator-authorized cache reuse, weaker than resume: key equality identifies
the same call shape but does not pin file bytes, args, now()/random() streams, or
world state — use it for research/pure-result agents, not for agents whose
correctness depends on file edits or other side effects. Never seeded: step()
results (durable side effects proven only against the old world), explicit-key
agents (an explicit key matches even a rewritten call), ask() answers, provider
sessions, steering mail, and any source result that received steering. The source
must be settled (completed/failed/interrupted/stale — a failed run's completed
agents seed fine) with a matching key version; --seed-from applies to fresh runs
only and cannot combine with --resume.
Budget
--budget N sets an output-token ceiling exposed as budget.total /
budget.spent() / budget.remaining(). It is advisory: checked before each
agent is admitted, so one in-flight agent can overshoot the remainder. Spend is
journaled (including failed and cancelled agents) and restored on resume.
CLI reference
| command | description |
|---|---|
flowition run <file> |
Run a workflow. --args <json> / --args-file <f>, --adapter, --model, --effort, --cwd, --concurrency N, --budget N, --resume <id>, --seed-from <id>, --detach, --json |
flowition resume <runId> |
Continue an interrupted run: journal replay plus provider-session resume. --concurrency, --budget, --json |
flowition runs |
List runs, newest first. --json |
flowition status <runId> |
Snapshot: phases, per-agent state, unanswered ask()s, queued mail, spend. --json |
flowition tail <runId> |
Print the run narrative, or one agent's transcript with --agent N. -f follows. --json |
flowition send <runId> <agent> <msg…> |
Steer a live agent by index or label (live-inject or queued follow-up turn) |
flowition answer <runId> <qid> <text…> |
Answer a workflow ask() |
flowition cancel <runId> |
Cancel the run, or one agent with --agent N |
flowition post <msg…> |
Agent→operator progress report; run/agent come from FLOWITION_* env or --run/--agent |
flowition result <runId> |
Print the final result; --wait [seconds] blocks until one exists |
flowition viewer |
Serve the authenticated local run UI. --port N, --control[=send,answer,cancel,resume,delete], --tailscale-origin https://…ts.net, --idle-shutdown, --idle-timeout M, --open, --print-url, --json |
flowition doctor |
Check each adapter CLI: found, version, steering/resume/schema capabilities, amp modes |
flowition guide |
Print the workflow authoring guide (written for agents) |
flowition mcp |
Serve flowition as an MCP stdio server |
MCP
flowition mcp serves stdio JSON-RPC with tools flowition_run (detached, returns a
runId), flowition_status, flowition_result (optional wait), flowition_send,
flowition_answer, flowition_cancel, flowition_resume, flowition_runs, and flowition_guide.
Any MCP-capable agent can therefore author a workflow, launch it, monitor it,
and steer its agents — the "invoked by agents" half of the loop. Agents
inside a run additionally receive FLOWITION_RUN_ID / FLOWITION_AGENT_INDEX /
FLOWITION_BIN and can flowition post progress upward or launch nested runs.
Configuration
| variable | effect |
|---|---|
FLOWITION_HOME |
State directory; runs live in $FLOWITION_HOME/runs/<runId>/ (default ~/.flowition) |
FLOWITION_NO_VIEWER |
Set to 1 to disable viewer auto-start for foreground TTY runs |
FLOWITION_VIEWER_PORT |
Default viewer port when --port is absent (normally 4646) |
FLOWITION_VIEWER_LOG |
Set to 1 for metadata-only HTTP access lines; queries and bodies are not logged |
FLOWITION_<CLI>_BIN |
Override an adapter's executable, e.g. FLOWITION_CLAUDE_BIN=/opt/claude |
FLOWITION_AMP_PLUGINS_DIR |
Where amp agent-mode plugins are discovered (default ~/.config/amp/plugins) |
Each run directory holds the journal, event stream, per-agent transcripts, control socket, and result; the layout is documented in ARCHITECTURE.md.
Security
Flowition does no sandboxing in this phase. Every adapter is run with its most
permissive flags — --dangerously-skip-permissions (claude),
--dangerously-bypass-approvals-and-sandbox (codex),
--skip-permissions-unsafe (droid), --auto (opencode), --force (cursor),
--always-approve --permission-mode bypassPermissions (grok),
and the equivalent non-interactive modes of amp and pi. Agents can read, write, and execute
anything the invoking user can, in the workflow's cwd and beyond.
Run only workflows you trust, with prompts you trust, on machines where that
level of access is acceptable — ideally inside a container or VM for anything
untrusted. Run directories are created 0700 (they contain full transcripts).
The viewer does not turn that local trust boundary into a remote service. It
binds 127.0.0.1 only, requires a 0600-file read token for every API read, has
no cookies or CORS, and is read-only unless --control explicitly grants
capabilities. Mutations additionally require an ephemeral in-memory control
token, same-origin requests, and JSON. The static UI is shipped under a
script-src 'self'; style-src 'self' CSP and renders transcript data without an
HTML injection path.
Those controls do not sandbox Flowition. A control credential can steer agents that already run with full user permissions. Loopback port presence is visible to other local users, and a process running as your user can read the token and the run files; that same-user adversary already has the CLI's access and is out of scope. See ARCHITECTURE.md → Viewer for the full posture and residuals.
Development
npm test # root node:test suite against a deterministic in-process mock adapter
The suite consumes no API credits and needs none of the real CLIs installed. The codebase is plain ESM with zero runtime dependencies; the engine internals — journal format, resume keys, mail-delivery semantics, the import scanner — are documented in ARCHITECTURE.md. Adapter behaviors (stream protocols, resume vehicles, flag quirks) were verified empirically against the real CLIs.
Status and roadmap
v0.1, including the first local viewer. Before this first release the engine went through an extensive adversarial review campaign — many rounds of cross-model review and fix validation, every confirmed finding fixed under a regression test. The suite that campaign produced ships with the project. The viewer is intentionally v1: local macOS/Linux only, read-only by default, and backed directly by run-directory artifacts rather than a database. Planned next: a sandboxing phase at the adapter layer and more adapters.